AMR Command Center

Assembly

Read and understand the Safety section before proceeding.

  1. Remove unit from shipping container.
  2. Remove wrap and packaging materials from unit.
  3. Rotate ROPS into the upright and locked position, replacing any parts removed to do so.
  4. Ensure all hardware is tight.
  5. Check oil levels.

Reconnecting… Connection lost Session ended

Hang tight, this only takes a few seconds. Check your internet connection, then try again. Reload the page to continue.